1 of 2

Now showing

Keystone Pipeline Not 12 May 2012

Sports2012Creative Commons
Poster for Keystone Pipeline Not 12 May 2012

About this film

Video of the Keystone Pipeline Not 12 May 2012. This is actually a 12 inch Natural Gas Pipeline that was built on the surface, capped at both ends, pressure tested. A 24 inch hole / tunnel was bored 19 meters below the Rideau River and then the 12 inch pipe was dragged through the 24 inch hole, entering on the east side of the Rideau while being pulled from the west side of the Rideau where it ultimately arrived.

Directors & creators

WorldWide Pucks / TA4ZMA

Subjects

Keystone Pipeline Not 12 May 2012; WorldWide Pucks; ta4zma

View on archive.org ↗

More from this pool

Sports

See all →